Product Details:
|
Color: | Blue,Green,Golden,Yellow | Standard: | JIS G -3312,ASTM A -755 ,EN -10169, IS -14246,G300-G550 |
---|---|---|---|
Top Paint: | 8-35 Micron | Certificates: | ISO 9001 / ISO 18001 / ISO 14001 /BSI / UL / FM |
Payment Terms: | T/T, LC | Grade: | SGHC, SGCC, DX51D, Q195, All According To The Customer's Request |
High Light: | Iso 18001 Prepainted Roofing Sheet,7um Prepainted Roofing Sheet,30um Color Coated Metal Sheet |
Iso 18001 Prepainted Roofing Sheet As Require 7-30um High Bearing Capacity
Correct use of special nails ⒈The special nail must be hit in the middle of the tile bone to have a waterproof effect. ⒉ The fixed interval of special nails is 50CM~100CM horizontally and vertically (preferably 4/㎡). ⒊Special nails must be hit from the lower end of the tile to the roof to have a beautiful, sealed and neat effect. Install weather strip ridge tile eaves cover 1. Divide the sealing strip into two halves, press the roof tile according to the tile type and cover the ridge tile with special nails. 2. At the junction of the side tiles, cover the ridge tiles directly after sealing with cement, and finish with a small tile file at the bottom of the ridge tiles. 3. The lower end of the tile, that is, the eaves, is directly installed with the eaves cover and fixed with screws. 4. At the junction of the ridge and tile, the control interface is trimmed with scissors and then overlapped and sealed with glass glue. Protruding part waterproof treatment First make a V-shaped material, you can choose different materials and specifications, depending on the actual situation. After installing the water connection at the bottom, lay color steel tiles on it. Inclined surface connection installation It refers to the construction of installing water-receiving treatment at the bottom after the two roof tiles are cut by angle and length. First, install the water-receiving material (ie gutter) under the tile, and then finish with waterproof adhesive or cement. |
Product Name |
30 32Gauge Corrugated Steel Roofing Sheet |
Skin Pass |
Yes |
Package |
waterproof paper+plastic film+iron packing+bunding, or as customer's requirement |
Steel Grade |
spcc , spgc |
Oiled or Non-oiled | Non-oiled |
Certificates | SO 9001 / ISO 18001 / ISO 14001 /BSI / UL / FM |
Delivery time |
35-50 days (based on quantity) after receiving advanced payment by T/T or LC |
bundle Weight |
3-8 Tons |
FAQ:
Q:Can you send samples?
A:Of course, we can send samples to all parts of the world, our samples are free, but customers need to bear the courier costs.
Q:What product information do I need to provide?
A:You need to provide the grade, width, thickness, coating and the number of tons you need to purchase.
Q:About product prices?
A:Prices vary from period to period due to cyclical changes in the price of raw materials.
Q:What are the certifications for your products?
A:We have ISO 9001, SGS, EWC and other certifications.
Q:How long does your delivery time take?
A:In general, our delivery time is within 30-45 days, and may be delayed if the demand is extremely large or special circumstances occur.
Q:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory. However, some of the plants are not open to the public.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed.
Q:How to pack the products?
A:The inner layer has a waterproof paper outer layer with iron packaging and is fixed with a fumigation wooden pallet. It can effectively protect products from corrosion during ocean transportation.
Contact Person: Elina
Tel: 17669729703
Fax: 86-0532-87961221